Project name:

TurkStream Offshore Pipeline

Location:

Anapa (Russia) Kiyikoy (Turkey)

Contractor:

South Stream Transport B.V. INTECSEA B.V.

Client:

Gazprom

Year:

2015-2020

Project Description:

TurkStream offshore pipeline directly connect the large gas reserves in Russia to Turkish gas transportation network, providing reliable energy for domestic supply and further south-east Europeans Countries.

The pipeline offshore system constructed by South Stream Transport B.V. consist of two parallel pipelines 32” crossing the Black Sea for 930 km with a gas capacity of 31.5 bcm/year.
The pipelines enter in the seawater at Russian Landfall near Anapa, on the Russian coast, and come ashore at Turkish Landfall, 100 kilometers west of Istanbul, near the village of Kiyikoy.

Instrumentation, Automation and Telecommunication activities performed:

Auriga Consulting provide engineering and consultancy services as part of PMC frame agreement signed by South Stream and Intecsea.

  • Third party verification of engineering documents regarding Russian Landfall and Turkish Gas Receiving Terminal FEED to directly support Contractors and Final Client during procurement, construction, pre-commissioning, and commissioning activities.
  • Detailed engineering developed for the two 32” lines at Turkish Landfall and Gas Receiving Terminal.

HSE and F&G activities performed:

  • Third party verification of engineering documents regarding Russian Landfall and Turkish Gas Receiving Terminal FEED to directly support Contractors during procurement, construction, pre-commissioning and commissioning activities.
  • Detailed engineering developed for the two 32” lines at Turkish Landfall and Gas Receiving Terminal Receiving

Project Figures

Job value > 2.000.000 Euro
Manhours > 30.000
Documents > 2.500