Skip to main content

Project name:

DBN 2

Location:

Centro Olio Val d’Agri (PZ) – Italy

Contractor:

QUINTO TRENO s.c.a.r.l. (BONATTI-GAVAZZI-IREM)

Client:

ENI

Year:

2012-2014

Project Description:

Debottlenecking DBN2 and Water Injection propaedeutic to install new 5th Gas Treatment Line.

Instrumentation and Automation activities performed:

Automation and Instrumentation department developed Basic Engineering and Detailed Engineering for Process Control, Safety Systems, Fiscal Metering System.
Field Instrument design and Control Valve sizing has developed for field engineering detailed design including datasheet preparation for field instrumentation, cable routing layout and Instrument list.

HSE activities performed:

HSE department was involved into the Hazardous Areas Classification according to the API 505 standard, into Quantitative Risk Analysis for the identification of the main contributors to the overall risk, including frequency assessment (according to API RP 581) and ignition probability.

Project Figures:

Job value > 250.000 Euro
Manhours > 10.000
Documents < 300