Project name:
TAP Onshore Pipeline
Location:
GCS00 Kipoi (Greece) ACS02 Bilisht (Albania) ACS03 Fier (Albania) IPR01 Melendugno (Italy)
Contractor:
JV RENCO TERNA RENCO S.p.A..
Client:
Trans Adriatic Pipeline AG
Year:
2016-2020
Project Description:
The Trans Adriatic Pipeline (TAP) is part of the Southern Gas Corridor, transporting natural gas to Europe from the Shah Deniz II field in Azerbaijan.
Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP crosses Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network
Instrumentation, Automation and activities performed:
Auriga Consulting provide detail engineering for Automation, Field Instrumentation and Telecommunication Systems for new Gas Compressor Stations GCS00/ACS03, Metering station ACS02 and IPR01 Receiving Terminal.
Main activities performed by Auriga I&C Division are:
- Data Sheets and Specification for Field Instruments, Controls and Safety Valves, supporting procurement phases with Technical Bids Evaluation and Vendors follow-up.
- Detail design of Safety and Control Systems (ESD, F&G, BMS, DCS, PLC) including procurement support, construction follow-up, testing, FAT, pre-commissioning, and commissioning activities.
Project Figures
Job value | > 1.000.000 Euro |
Manhours/td> | > 30.000 |
Documents | > 1.000 |