Project name:
GR4 Project
Location:
Hassi R’Mel, Algeria
Contractor:
Bonatti S.p.A.
Client:
Sonatrach
Year:
2015-2016
Project Description:
Project refers to the realization of a compression station for the 48” GR4 pipeline to increase the pipeline pressure allowing the gas to achieve the Centre National de Dispatching Gaz (CNDG) of Hassi R’Mel.
The turnkey contract for construction of new gas compressor station consists of a filtration section for inbound gas, 4 compression trains made up of turbocharged gas of nearly 25 MW each and a metering station, plus all supporting utilities.
The station mainly includes individual buildings for turbochargers, dry coolers, productions and distribution utilities, control room, electrical room, and various buildings.
Instrumentation activities performed:
Data Sheets, Material requisition, technical bid evaluations, vendor follow up for field instruments and process actuated valves for Control and Safety systems.
Project Figures
Job value | < 250.000 Euro |
Manhours | > 2500 |
Documents | < 400 |